Project Name:
Meter Testing and Analysis

Client:
Goulburn-Murray Water
Project Description:
The objectives of this project were to:
- review and assess the latest in-situ field flow measurement error verification data for a
sample of Large Dethridge Meter outlets, Mag Flow meters and FlumeGates provided by
Thiess Services - provide a report outlining the tested flow measurement accuracy of Large Dethridge Meter
outlets tested and other meters tested.
Hydro Environmental was engaged to help achieve these objectives, through:
- checking the Thiess Environmental Services data collection process for rigor and integrity
- checking the Thiess Services analysis process for accuracy and integrity
- analysing in-situ field flow measurement error verification data for 53 LMOs (43 from 2008
and 10 from 2007) and other meters provided by Thiess Environmental Services - preparing conclusions and recommendations based on the findings from the in-situ field
flow measurement error verification data.
Key Skills Applied:
Data management, meter error calculation and analysis, knowledge management, water regulatory framework, water planning and management, project management, report writing, performance target setting.