Project Name:

Meter Testing and Analysis

Meter Testing and Analysis

 

Client:

Goulburn-Murray Water

Project Description:

The objectives of this project were to:

  1. review and assess the latest in-situ field flow measurement error verification data for a
    sample of Large Dethridge Meter outlets, Mag Flow meters and FlumeGates provided by
    Thiess Services
  2. provide a report outlining the tested flow measurement accuracy of Large Dethridge Meter
    outlets tested and other meters tested.

Hydro Environmental was engaged to help achieve these objectives, through:

  1. checking the Thiess Environmental Services data collection process for rigor and integrity
  2. checking the Thiess Services analysis process for accuracy and integrity
  3. analysing in-situ field flow measurement error verification data for 53 LMOs (43 from 2008
    and 10 from 2007) and other meters provided by Thiess Environmental Services
  4. preparing conclusions and recommendations based on the findings from the in-situ field
    flow measurement error verification data.

Key Skills Applied:

Data management, meter error calculation and analysis, knowledge management, water regulatory framework, water planning and management, project management, report writing, performance target setting.

 

Previous - Project Highlights - Next